EbikeMate

Kangaroo Point Bridge (green bridge): an e-bike rider’s guide

460 m from Alice and Edward Streets, CBD to Scott Street, Kangaroo Point · Brisbane CBD to Kangaroo Point

Checked · sources below

Length
460 m (460 m across the river; opened December 2024)
Start
Alice and Edward Streets, CBD
Finish
Scott Street, Kangaroo Point
Region
Brisbane CBD to Kangaroo Point
Difficulty
Maximum grade 1:20

E-bike rules here

Dedicated pedestrian and cycle paths; no bridge-specific speed or dismount rule listed by council. Queensland rules apply: 250 W motor, assistance to 25 km/h, 12 km/h on footpaths, 12 km/h when passing pedestrians on shared paths (otherwise the signed limit), give way to pedestrians, and wear a helmet. Since 31 August 2026 riders must be 16 or older with at least a learner licence — urban paths like this one are not covered by the recreational-area exemption.

قوانين الدراجات الكهربائية في كوينزلاند · Is my e-bike legal? 1-minute check

Highlights

  • Separate pedestrian and cycle paths at least 6.8 m wide في total
  • A restaurant and bar on the bridge, and a café at the city landing
  • On the Kangaroo Point side, a separated path runs from Main Street to Deakin Street, with an underpass beneath the Story Bridge

Before you go

  • A lift runs from the deck down to C.T. White Park and the riverwalk
  • A handy alternative while the Story Bridge closes for works over summer 2026–27
Charging and battery range. Gravel, hills and headwinds drain a battery faster than the spec sheet says. Plan your stops, carry your charger, and never leave a battery charging unattended — see battery safety.

أسئلة شائعة

Can you ride an e-bike on the Kangaroo Point Bridge (green bridge)?

Dedicated pedestrian and cycle paths; no bridge-specific speed or dismount rule listed by council. Queensland rules apply: 250 W motor, assistance to 25 km/h, 12 km/h on footpaths, 12 km/h when passing pedestrians on shared paths (otherwise the signed limit), give way to pedestrians, and wear a helmet. Since 31 August 2026 riders must be 16 or older with at least a learner licence — urban paths like this one are not covered by the recreational-area exemption.

How long is the Kangaroo Point Bridge (green bridge)?

460 m (460 m across the river; opened December 2024), from Alice and Edward Streets, CBD to Scott Street, Kangaroo Point.

المصادر

Conditions change — check the official site for closures before you ride. EbikeMate is not affiliated with the trail’s managers. Spotted something out of date? أخبرنا.

أنشئ جواز دراجتي المجاني

دراجتك

احفظ دراجتك وستُظهر كل قطعة ما إذا كانت تناسبها. تُحفظ على هذا الجهاز؛ لا حاجة إلى حساب.

أضف دراجتك

العلامة التجارية غير موجودة؟ اختر حسب نظام المحرك — القطع تتبع المحرك، لا الشعار المكتوب على الإطار.

أين أنت؟

رمزك البريدي يحدد ما يمكنك رؤيته. البطاريات للاستلام الشخصي فقط، لذا لا تظهر إلا للمشترين القريبين من البائع، وبعض المنتجات لا تظهر في كل الولايات.