EbikeMate

Kangaroo Point Bridge (green bridge): an e-bike rider’s guide

460 m from Alice and Edward Streets, CBD to Scott Street, Kangaroo Point · Brisbane CBD to Kangaroo Point

Checked · sources below

Length
460 m (460 m across the river; opened December 2024)
Start
Alice and Edward Streets, CBD
Finish
Scott Street, Kangaroo Point
Region
Brisbane CBD to Kangaroo Point
Difficulty
Maximum grade 1:20

E-bike rules here

Dedicated pedestrian and cycle paths; no bridge-specific speed or dismount rule listed by council. Queensland rules apply: 250 W motor, assistance to 25 km/h, 12 km/h on footpaths, 12 km/h when passing pedestrians on shared paths (otherwise the signed limit), give way to pedestrians, and wear a helmet. Since 31 August 2026 riders must be 16 or older with at least a learner licence — urban paths like this one are not covered by the recreational-area exemption.

ਕੁਈਨਜ਼ਲੈਂਡ ਦੇ ਈ-ਬਾਈਕ ਕਾਨੂੰਨ · Is my e-bike legal? 1-minute check

Highlights

  • Separate pedestrian and cycle paths at least 6.8 m wide — total ਵਿੱਚ
  • A restaurant and bar on the bridge, and a café at the city landing
  • On the Kangaroo Point side, a separated path runs from Main Street to Deakin Street, with an underpass beneath the Story Bridge

Before you go

  • A lift runs from the deck down to C.T. White Park and the riverwalk
  • A handy alternative while the Story Bridge closes for works over summer 2026–27
Charging and battery range. Gravel, hills and headwinds drain a battery faster than the spec sheet says. Plan your stops, carry your charger, and never leave a battery charging unattended — see battery safety.

ਆਮ ਸਵਾਲ

Can you ride an e-bike on the Kangaroo Point Bridge (green bridge)?

Dedicated pedestrian and cycle paths; no bridge-specific speed or dismount rule listed by council. Queensland rules apply: 250 W motor, assistance to 25 km/h, 12 km/h on footpaths, 12 km/h when passing pedestrians on shared paths (otherwise the signed limit), give way to pedestrians, and wear a helmet. Since 31 August 2026 riders must be 16 or older with at least a learner licence — urban paths like this one are not covered by the recreational-area exemption.

How long is the Kangaroo Point Bridge (green bridge)?

460 m (460 m across the river; opened December 2024), from Alice and Edward Streets, CBD to Scott Street, Kangaroo Point.

ਸਰੋਤ

Conditions change — check the official site for closures before you ride. EbikeMate is not affiliated with the trail’s managers. Spotted something out of date? ਸਾਨੂੰ ਦੱਸੋ.

ਮੇਰਾ ਮੁਫ਼ਤ ਬਾਈਕ ਪਾਸਪੋਰਟ ਬਣਾਓ

ਤੁਹਾਡੀ ਬਾਈਕ

ਆਪਣੀ ਬਾਈਕ ਸੇਵ ਕਰੋ, ਫਿਰ ਹਰ ਪੁਰਜ਼ਾ ਦੱਸੇਗਾ ਕਿ ਇਹ ਫਿੱਟ ਹੁੰਦਾ ਹੈ ਜਾਂ ਨਹੀਂ। ਇਸੇ ਡਿਵਾਈਸ 'ਤੇ ਰੱਖੀ ਜਾਂਦੀ ਹੈ; ਖਾਤੇ ਦੀ ਲੋੜ ਨਹੀਂ।

ਆਪਣੀ ਬਾਈਕ ਜੋੜੋ

ਬ੍ਰਾਂਡ ਸੂਚੀ ਵਿੱਚ ਨਹੀਂ? ਮੋਟਰ ਸਿਸਟਮ ਨਾਲ ਚੁਣੋ — ਪੁਰਜ਼ੇ ਮੋਟਰ ਮੁਤਾਬਕ ਹੁੰਦੇ ਹਨ, ਫ੍ਰੇਮ ਦੇ ਬੈਜ ਮੁਤਾਬਕ ਨਹੀਂ।

ਤੁਸੀਂ ਕਿੱਥੇ ਹੋ?

ਤੁਹਾਡਾ ਪੋਸਟਕੋਡ ਤੈਅ ਕਰਦਾ ਹੈ ਕਿ ਤੁਸੀਂ ਕੀ ਦੇਖ ਸਕਦੇ ਹੋ। ਬੈਟਰੀਆਂ ਸਿਰਫ਼ ਪਿਕਅੱਪ ਲਈ ਹਨ, ਇਸ ਲਈ ਇਹ ਸਿਰਫ਼ ਵਿਕਰੇਤਾ ਦੇ ਨੇੜੇ ਵਾਲੇ ਖਰੀਦਦਾਰਾਂ ਨੂੰ ਦਿਖਦੀਆਂ ਹਨ, ਅਤੇ ਕੁਝ ਚੀਜ਼ਾਂ ਹਰ ਸਟੇਟ ਵਿੱਚ ਨਹੀਂ ਦਿਖਾਈਆਂ ਜਾਂਦੀਆਂ।