EbikeMate

Kangaroo Point Bridge (green bridge): an e-bike rider’s guide

460 m from Alice and Edward Streets, CBD to Scott Street, Kangaroo Point · Brisbane CBD to Kangaroo Point

Checked · sources below

Length
460 m (460 m across the river; opened December 2024)
Start
Alice and Edward Streets, CBD
Finish
Scott Street, Kangaroo Point
Region
Brisbane CBD to Kangaroo Point
Difficulty
Maximum grade 1:20

E-bike rules here

Dedicated pedestrian and cycle paths; no bridge-specific speed or dismount rule listed by council. Queensland rules apply: 250 W motor, assistance to 25 km/h, 12 km/h on footpaths, 12 km/h when passing pedestrians on shared paths (otherwise the signed limit), give way to pedestrians, and wear a helmet. Since 31 August 2026 riders must be 16 or older with at least a learner licence — urban paths like this one are not covered by the recreational-area exemption.

昆士兰州电动自行车法规 · Is my e-bike legal? 1-minute check

Highlights

  • Separate pedestrian and cycle paths at least 6.8 m wide(total)
  • A restaurant and bar on the bridge, and a café at the city landing
  • On the Kangaroo Point side, a separated path runs from Main Street to Deakin Street, with an underpass beneath the Story Bridge

Before you go

  • A lift runs from the deck down to C.T. White Park and the riverwalk
  • A handy alternative while the Story Bridge closes for works over summer 2026–27
Charging and battery range. Gravel, hills and headwinds drain a battery faster than the spec sheet says. Plan your stops, carry your charger, and never leave a battery charging unattended — see battery safety.

常见问题

Can you ride an e-bike on the Kangaroo Point Bridge (green bridge)?

Dedicated pedestrian and cycle paths; no bridge-specific speed or dismount rule listed by council. Queensland rules apply: 250 W motor, assistance to 25 km/h, 12 km/h on footpaths, 12 km/h when passing pedestrians on shared paths (otherwise the signed limit), give way to pedestrians, and wear a helmet. Since 31 August 2026 riders must be 16 or older with at least a learner licence — urban paths like this one are not covered by the recreational-area exemption.

How long is the Kangaroo Point Bridge (green bridge)?

460 m (460 m across the river; opened December 2024), from Alice and Edward Streets, CBD to Scott Street, Kangaroo Point.

资料来源

Conditions change — check the official site for closures before you ride. EbikeMate is not affiliated with the trail’s managers. Spotted something out of date? 告诉我们.

创建我的免费车辆护照

你的车

保存你的车,每个配件都会显示是否适配。信息仅保存在本设备上,无需注册账户。

添加你的车

找不到你的品牌? 按电机系统选择 ——配件适配看的是电机,而不是车架上的品牌标志。

你在哪里?

你的邮编决定你能看到哪些商品。电池仅限自取,因此只向卖家附近的买家显示;另有部分商品并非在所有州都显示。