EbikeMate

Kangaroo Point Bridge (green bridge): an e-bike rider’s guide

460 m from Alice and Edward Streets, CBD to Scott Street, Kangaroo Point · Brisbane CBD to Kangaroo Point

Checked · sources below

Length
460 m (460 m across the river; opened December 2024)
Start
Alice and Edward Streets, CBD
Finish
Scott Street, Kangaroo Point
Region
Brisbane CBD to Kangaroo Point
Difficulty
Maximum grade 1:20

E-bike rules here

Dedicated pedestrian and cycle paths; no bridge-specific speed or dismount rule listed by council. Queensland rules apply: 250 W motor, assistance to 25 km/h, 12 km/h on footpaths, 12 km/h when passing pedestrians on shared paths (otherwise the signed limit), give way to pedestrians, and wear a helmet. Since 31 August 2026 riders must be 16 or older with at least a learner licence — urban paths like this one are not covered by the recreational-area exemption.

昆士蘭電動單車法例 · Is my e-bike legal? 1-minute check

Highlights

  • Separate pedestrian and cycle paths at least 6.8 m wide(total)
  • A restaurant and bar on the bridge, and a café at the city landing
  • On the Kangaroo Point side, a separated path runs from Main Street to Deakin Street, with an underpass beneath the Story Bridge

Before you go

  • A lift runs from the deck down to C.T. White Park and the riverwalk
  • A handy alternative while the Story Bridge closes for works over summer 2026–27
Charging and battery range. Gravel, hills and headwinds drain a battery faster than the spec sheet says. Plan your stops, carry your charger, and never leave a battery charging unattended — see battery safety.

常見問題

Can you ride an e-bike on the Kangaroo Point Bridge (green bridge)?

Dedicated pedestrian and cycle paths; no bridge-specific speed or dismount rule listed by council. Queensland rules apply: 250 W motor, assistance to 25 km/h, 12 km/h on footpaths, 12 km/h when passing pedestrians on shared paths (otherwise the signed limit), give way to pedestrians, and wear a helmet. Since 31 August 2026 riders must be 16 or older with at least a learner licence — urban paths like this one are not covered by the recreational-area exemption.

How long is the Kangaroo Point Bridge (green bridge)?

460 m (460 m across the river; opened December 2024), from Alice and Edward Streets, CBD to Scott Street, Kangaroo Point.

資料來源

Conditions change — check the official site for closures before you ride. EbikeMate is not affiliated with the trail’s managers. Spotted something out of date? 告訴我們.

建立我的免費單車護照

你的單車

儲存你的單車,每件零件都會顯示是否適用。資料只保存在此裝置,無需帳戶。

加入你的單車

找不到品牌? 按摩打系統選擇 — 零件是否適用取決於摩打,而不是車架上的品牌標誌。

你在哪裡?

你的郵區編號決定你可以看到哪些物品。電池只限自取,因此只會向賣家附近的買家顯示,而部分物品並非在每個州都會顯示。